Project
New SCMS for 3 Nos. of Primary Substation at Khalifa Port - Hitachi Energy
This project includes Design, Supply, Installation, Testing and Commissioning of new SCMS
About this project
AD Ports Group operates three primary substations serving Khalifa Port, and all three needed their control and monitoring systems replaced. Almafor delivered the work as main contractor across the substations designated KPZPRY-1, KPZPRY-2 and KPZPRY-3.
A port does not stop. Cranes keep drawing power, vessels keep working, and the electrical network behind them has to stay visible and controllable through every hour of a changeover. That constraint shaped the project more than any single technical requirement.
The contract covered the full hardware and software replacement together with everything around it: site survey, detailed design, shop drawings, the civil works, and the IT and fibre optic network connecting the stations to the port's operations. Almafor also carried the interface with the port's own stakeholders, which on a live industrial site is a substantial part of the work rather than an administrative detail.
Handover included operator and engineering training and a full set of operation and maintenance manuals. That matters more than it sounds. A control system handed over without documentation and trained people regenerates the same obsolescence problem within a few years, and the next replacement then starts from the same position of not knowing what is installed.
Scope of work
- by replacing the existing Hardware and Software in to implement new SCMS which is critical
- part of the asset which is used to operate, control, monitor performance and also includes site
- survey, detailed design, shop drawings, civil works and IT FO cable network connectivity works,
- necessary interface with AD ports-Stake holders.
Equipment installed
- Hitachi Energy SCMS platform, MicroSCADA supervisory software
- Hitachi Energy RTU500 series remote terminal units
- REF615 feeder protection relays, interfaced to the existing IEDs
- 6 operator workstations, 6 engineering workstations and 12 monitors
- 39 ethernet switches and 6 ethernet firewalls, RuggedCom substation grade
- 27 USM annunciators, 6 GPS time sync devices and 3 printers
- Fibre optic communication infrastructure linking the substations to the ADPC buildings