Scope of work

  • Electric cables pulled through conduit
  • Electric cables fixed on cable trays,
  • Surface mounted conduits, cable trays and its supports,
  • Lighting fixtures,
  • Socket outlets and isolators,
  • Earthing system complete with its fixing accessories and earthing pits,
  • Installation, testing and commissioning of SMDB's and DB's supplied by the Contractor,
  • Installation and termination of fan panels and motors,
  • Installation and termination ofsump pump (5nos) panels and motors,
  • Installation and termination of irrigation pump (2nos) panels and motors,
  • Installation and termination of fire pump (3nos) panels and motors,
  • Installation and termination of split unit (indoor/outdoor),
  • Obtaining the necessary approvals from the Engineer for the Subcontractor's proposed materials prior to their use.

Equipment installed

  • PLC, RTU and HMI for the irrigation and fire hydrant pump rooms
  • Field instrumentation and the electrical works around it

The platforms and controllers we work on

abu dhabi 20121004 01254 9bb7dd0c
1 b68def1b

Planning similar work?

Talk to the engineers who delivered this project.

Speak to an engineer See all projects

Trusted By

Abu Dhabi City Municipality
Abu Dhabi Ports
Bilfinger
Schneider Electric
Caterpillar
Hitachi Energy
PcVue Solutions
General Electric
TAQA Transmission
TAQA Distribution
Etihad Water and Electricity
Etihad Rail
Abu Dhabi Investment Council
Schlumberger
ADNEC
Call an engineer · +971 55 954 5801