+971 55 954 5801

About this project

TRANSCO project N-15228 replaced the substation control and monitoring system at the Mussafah grid station, which operates at 220 kV, 33 kV and 11 kV. The platform being retired had reached the end of its supported life. Almafor delivered the replacement as main contractor.

The station is large enough that the bay level dominates the scope. Ninety Schneider C264 bay control units were installed, one per bay, so that a fault in any single controller cannot take the visibility of the whole station with it. Each unit reads the position of every switch in its bay, measures the electrical quantities, enforces the interlocking that decides whether an operation is permitted, and timestamps what it sees at the bay rather than at the server.

Above them sit the station controllers and two separate pairs of redundant gateways. One pair publishes the 220 kV side to the Load Dispatch Centre, the other publishes the 33 kV and 11 kV sides to the Distribution Management System. Two audiences with different data needs, deliberately not served from a single device. GPS receivers and antennae discipline the station clock so a disturbance can be reconstructed in the order it actually happened, and a 5 kVA UPS keeps the control layer alive through an auxiliary supply failure.

The work was carried out on a station that stayed in service throughout. Each bay was surveyed, its new controller installed, configured and point to point tested against the existing interlocking, and only then cut over. The platform is Schneider EcoFIT, and the new communication links to the Load Dispatch Centre and to the distribution utility were commissioned within the same contract.

Scope of work

  • Supply, Installation, Integration, Testing & Commissioning of Redundant Gateways for LDC/ECC (220kV part), Redundant Gateways for DMS (33/11kV Part), SCMS Station Controllers, FO cables, LAN switches , Routers, SCMS workstations, all AVR, Common Alarm and 220/33/11kV BCUs, temperature sensors, Common alarm panels, GPS System Including Antennae, new 5kVAUPS, MODEMS etc.
  • Establishment of new link to remote control center LDC (Transco), DMS (ADDC) and testing.
  • Schneider Electric EcoFIT System based solution
  • Total of 90 new BCU’s (C264) Installed & tested.
  • Design engineering for adaptation work in LCP panels.

Equipment installed

  • Schneider Electric EcoFIT based substation automation solution
  • 90 C264 bay control units, supplied, installed and tested
  • Redundant gateways to LDC and ECC on the 220 kV side, and to DMS on the 33/11 kV side
  • SCMS station controllers, workstations, LAN switches and routers
  • GPS time synchronisation system including antennae
  • New 5 kVA UPS, modems and fibre optic cabling

The platforms and controllers we work on

img 0394 bcd5c4f4
img 4631 f44da1ee
img 4624 cef87fbb
img 4602 d1885059
img 4616 67671c77

Planning similar work?

Talk to the engineers who delivered this project.

Speak to an engineer See all projects

Trusted By

Abu Dhabi City Municipality
Abu Dhabi Ports
Bilfinger
Schneider Electric
Caterpillar
Hitachi Energy
PcVue Solutions
General Electric
TAQA Transmission
TAQA Distribution
Etihad Water and Electricity
Etihad Rail
Abu Dhabi Investment Council
Schlumberger
ADNEC
Call an engineer · +971 55 954 5801