About this project

The mosque on Ras Ghurab Island required a building management system, and Almafor delivered the supply, installation, testing and commissioning as a specialist subcontractor.

A mosque has an unusual load profile. The building is close to empty for most of the day and fills within a few minutes, five times over, every day. Cooling a space with that pattern on a fixed schedule is either wasteful for most of the day or inadequate at exactly the moment it matters, which makes it a control problem before it is an energy problem.

Scope covered the direct digital control equipment, the thermostats and the associated cable works. The plant has to respond to occupancy and to outside conditions rather than to a timer, and somebody has to be able to see whether it did.

The other characteristic of a building like this is that it cannot be taken out of service. There is no shutdown window for a mosque, so the control work is arranged around the building's use rather than the other way round.

Scope of work

  • Supply, Installation and Testing and Commissioning Thermostat.
  • Supply and laying of Cable works.

Equipment installed

  • Direct digital control panel for the building management system
  • Thermostats, supplied, installed, tested and commissioned

The platforms and controllers we work on

img 4120 449ce72d
img 4103 7aa8dd5d
img 3187 38257f64
img 3245 a7f3851f
image 26 ab0c2ad3
image 28 d531259d

Planning similar work?

Talk to the engineers who delivered this project.

Speak to an engineer See all projects

Trusted By

Abu Dhabi City Municipality
Abu Dhabi Ports
Bilfinger
Schneider Electric
Caterpillar
Hitachi Energy
PcVue Solutions
General Electric
TAQA Transmission
TAQA Distribution
Etihad Water and Electricity
Etihad Rail
Abu Dhabi Investment Council
Schlumberger
ADNEC
Call an engineer · +971 55 954 5801