Services

SCADA Integration in Abu Dhabi

Supervisory control for grid stations, pumping networks and pipelines, including the ones that have to keep running while the work goes on.

What we do

SCADA integration for utilities, ports and municipalities

We have been integrating SCADA systems in Abu Dhabi since 2008. Most of that work has been on assets already in service: transmission stations under load, pumping networks feeding district irrigation, and a potable water pipeline crossing open desert.

We are an engineering contractor. The same team specifies the architecture, configures the servers, terminates the fibre and attends site acceptance. That matters on brownfield jobs, because when a point stops updating the cause is usually in the wiring, the gateway or the point list rather than the software.

Typical brief

Where most enquiries start

Very few of these projects begin on a clean site. Usually it is one of the following.

Obsolete hardware

The system still runs, but the vendor has ended support, spares come from the second hand market, and the engineer who configured it has left. We survey the installation, document what is actually there, and stage the replacement so the process is never dropped.

No route for the data

The plant is fine. Getting anything out of it is not. This is gateway and protocol work: IEC 60870 5 101 and 104, Modbus RTU and TCP, IEC 61850 on newer bays, and the point mapping that keeps one signal meaning one thing on both sides of the link.

New plant, existing control room

A pump station or substation joining a network that is already in service. The difficulty is rarely the new equipment. It is addressing, alarm philosophy, and agreeing who owns which side of the interface before anyone is on site.

Scope

What the scope usually covers

  • System design and architecture
  • Hardware specification and supply
  • Database and mnemonic configuration
  • Graphics and HMI development
  • Alarm and event configuration
  • Gateway and protocol mapping
  • Redundancy and failover
  • Fibre optic and IT network installation
  • Factory acceptance testing
  • Site installation and termination
  • Site acceptance testing and control centre integration
  • Operator and engineer training
  • As built documentation and O&M manuals
  • Civil works where the contract includes them

Platforms

Platforms and protocols

On replacement work the platform is set by whatever your control centre already speaks. We have delivered on Schneider, GE and PCVue systems, and we are not tied to one vendor.

Schneider Electric EcoFIT Schneider C264 BCU PCVue SCADA GE Proficy IEC 61850 IEC 60870 5 101 / 104 Modbus RTU / TCP DNP3 ISO 9001:2015 ISO 45001:2018

Method

How a project runs

  1. Survey

    On brownfield work this is the week that saves the programme. Drawings and installation rarely agree.

  2. Detailed design

    Architecture, point schedules, network topology, panel arrangement and shop drawings for approval.

  3. Factory test

    Configured and proven in our facility with your engineers present, before anything ships.

  4. Installation

    Panels, cabling, fibre and terminations, plus civil and MEP work where the contract includes it.

  5. Site test

    Point to point checks, then live integration with the control centre.

  6. Handover

    Operators and engineers trained separately, since they need different things, with as built drawings and manuals.

Questions

Common questions

Can you integrate a system you did not supply?

Yes. Most of this work is exactly that. It begins with a survey of the existing configuration and the protocols it exposes.

Can it be done without shutting the plant down?

In most cases. Grid stations are cut over bay by bay and pumping systems around duty and standby sets. It has to be designed in from the beginning rather than solved on site.

Do you cover civil and electrical work too?

Yes. Keeping one contractor across that boundary removes the interface arguments that cause most of the delay on these jobs.

Where do you work?

Abu Dhabi, Al Ain and across the United Arab Emirates. We are an Abu Dhabi company.

How long does a project take?

A single pump station can be a few months. Multi station grid replacements run for years. The two TRANSCO SCMS contracts ran from 2017 to 2022 and 2023.

Related

Next step

Speak to an engineer

Tell us what you have installed and what it needs to do. You will get someone who has commissioned these systems, not a sales desk.

OfficeOffice 4, Mezzanine 2, Dongfeng building, Estiklal Street, Abu Dhabi
We blend innovation with technology to create seamless, immersive experiences. From concept to execution, we transform ideas into reality with precision and creativity.
© 2025 Almafor. All rights reserved.
Designed & Developed by