Design and Construction of 67 Parks and Playgrounds in Various Areas in the City of Abu Dhabi CP11
Department of Municipalities & Transport, Abu Dhabi (DMT)
Guide
Most panel shops in the UAE will build what your schedule says. The question worth asking is what happens when the schedule is wrong.
The buying decision
You can send a complete design to a fabrication workshop and receive a panel built to it. That is the cheaper route and it works well when the design is finished, approved and unlikely to move. The workshop is not responsible for whether the design was right, and it will not be at site when the panel is energised.
Or you can buy the panel from the contractor who will install it, terminate it, commission it and stand at site acceptance. That party has a direct interest in gland plate layout, cable entry that matches the route the cables actually take, and terminal numbering that matches the as built schedule rather than the design one. A fault built in is a fault they come back for.
Almafor builds panels in its own workshop in Mussafah Industrial Area, Abu Dhabi, and then installs and commissions them. The section below covers what to check whichever route you choose.
Panel types
Form 4 motor control centres for pumping and process plant, including starter, soft starter and variable frequency drive sections, with the metering and protection that goes with them.
Variable frequency drive panels including medium voltage, with the thermal design and harmonic mitigation the duty requires. Drive replacement on running plant is a large part of this work.
Instrumentation and control panels, remote terminal unit cabinets for pipeline and irrigation sites, and PLC panels with the marshalling and IO conditioning around them.
Substation control and monitoring system cubicles, bay control unit panels, communication and fibre cabinets, and the inverter and auxiliary supply panels that support them.
Before you order
Track record
Panels for these contracts were built in our own workshop and commissioned by the same team.
Department of Municipalities & Transport, Abu Dhabi (DMT)
TAQA Distribution
TAQA distribution
Components
Component selection normally follows the client specification and the asset owner's approved vendor list. These are the ranges we work with most.
Build process
Schematics, general arrangement, IO schedule and bill of materials, issued for client and asset owner approval before any metal is cut.
Enclosure preparation, busbar, component mounting and wiring to the approved schematics, with terminal numbering agreed at design stage rather than invented on the bench.
Controllers and drives are loaded and the panel is powered in the workshop. Faults found here are cheap.
Function tested against the approved schedule with your engineers present. Finding a wiring error in Mussafah costs an afternoon. Finding the same error in an energised substation costs an outage window.
Transport, positioning, termination, loop checking and site acceptance, carried out by the people who built it.
Common questions
Workshop 13, Al Busnad 1 Street, M45, Mussafah Industrial Area, Abu Dhabi. Panels are built, configured, powered and function tested there before they go to site, and clients are welcome to attend the factory acceptance test.
Yes. We build to client and consultant designs as well as to our own. Where we see something in a supplied schedule that will cause a problem at site, we raise it before building rather than after, because we are usually the ones who will be terminating it.
Form 4 describes the degree of internal separation in a low voltage assembly, where busbars, functional units and terminals for outgoing circuits are separated from each other. It allows work on one outgoing way while others remain live, which is why it is commonly specified for motor control centres on plant that has to keep running.
The build itself is rarely the constraint. Design approval with the client and asset owner comes first, and long lead components, particularly drives and certain protection relays, often set the delivery date. We quote those two separately from the build programme so the critical path is visible.
Yes. It is sequenced so the existing panel keeps the plant available until the new one is proved, with the changeover done inside outage windows agreed with the operator. This is how the substation and pump station replacements in our project list were carried out.
Related
Tell us about the system you need built, upgraded or kept running.