About this project

Al Jazeera Hospital is supplied from an 11 kV switching station, and its standby power system had reached the point of replacement. Almafor delivered the upgrade as main contractor under project D-106669.

The new standby plant is a containerised diesel generator rated 3000 kVA at 11 kV, integrated into the existing 11 kV switching station rather than installed alongside it as a separate island. A 500 kVA station auxiliary transformer at 11 kV to 415 V was installed to carry the station's own services.

The control scope is what turns a generator into a standby system. A Remote Generator Control Panel provides supervision and control away from the machine itself, and an Automatic Mains Failure scheme with synchronising detects the loss of supply, starts and loads the set, and returns the load to the incoming supply without a second interruption when it recovers. A remote monitoring modem lets the plant be interrogated without attending site.

A hospital is the clearest case for why standby power is a control problem rather than an equipment problem. A generator that starts is not the requirement. A generator that starts, takes load in the right order and hands it back cleanly, with somebody able to see that it did, is the requirement.

Scope of work

  • Supply, installation, connection and Testing of 1 no. of Station Auxiliary Transformer 500 KVA(11KV/415V) and accessories inside existing DGU compound and LV supply to be connected to DGU auxiliary panel in DGU container.
  • Supply, installation, interfacing, testing and commissioning of Remote control Panel (RGCP),One Automatic main Failure with Synchronizing panel incorporate with inbuilt Remote Generator Monitoring Modem

Equipment installed

  • 3000 kVA standby containerised diesel generator, 11 kV, 0.8 power factor at the alternator terminal, 50 Hz, 1500 rpm
  • 500 kVA station auxiliary transformer, 11 kV / 415 V
  • Remote generator control panel
  • Automatic mains failure panel with synchronising, and an inbuilt remote generator monitoring modem
  • Interfaced into the existing 11 kV switching station

The platforms and controllers we work on

img11 9c6da449
img4 fcf11194
img 8480 afe88ff4
img5 d4b9f0c7
img 0900 c8cebe9b
img 0915 7c90dafc

Planning similar work?

Talk to the engineers who delivered this project.

Speak to an engineer See all projects

Trusted By

Abu Dhabi City Municipality
Abu Dhabi Ports
Bilfinger
Schneider Electric
Caterpillar
Hitachi Energy
PcVue Solutions
General Electric
TAQA Transmission
TAQA Distribution
Etihad Water and Electricity
Etihad Rail
Abu Dhabi Investment Council
Schlumberger
ADNEC
Call an engineer · +971 55 954 5801