Al Tala Board Manufacturing operates a plant at KIZAD, and Almafor delivered its centralised energy and water metering and monitoring system for Estidama compliance.

In a manufacturing plant the metering question is different from an office building. Consumption is dominated by process equipment rather than by comfort systems, and the useful breakdown follows the production line rather than the floor plan. Metering at the incomer tells an owner what the plant cost. Metering by system tells them which part of the plant to look at.

Scope covered both energy and water, brought back to a central point and recorded, so that consumption can be reported rather than estimated and a change in the pattern can be investigated while it is still small.

Water metering is the part more often left out, and on an industrial site it is frequently where the unexplained consumption sits. A leak on a buried service can run for months inside the noise of a plant's total usage unless the usage is broken down.

Equipment installed

  • Centralised energy and water metering and monitoring system, to Estidama requirements

The platforms and controllers we work on

img 20180103 174253 02efff60
img 20180103 171846 172acb2d

Planning similar work?

Talk to the engineers who delivered this project.

Speak to an engineer See all projects

Trusted By

Abu Dhabi City Municipality
Abu Dhabi Ports
Bilfinger
Schneider Electric
Caterpillar
Hitachi Energy
PcVue Solutions
General Electric
TAQA Transmission
TAQA Distribution
Etihad Water and Electricity
Etihad Rail
Abu Dhabi Investment Council
Schlumberger
ADNEC
Call an engineer · +971 55 954 5801