A bay control unit is where substation automation stops being software and starts being the switchgear. We have installed and tested ninety C264 units at a single TRANSCO grid station, and that experience is the substance of this page.
The platform
The MiCOM C264 is a bay control unit: one hardened controller per switchgear bay, reading every switch position, measuring the electrical quantities, enforcing the interlocking that decides whether an operation is permitted, and timestamping events at the bay itself rather than at a server. PACiS is the substation automation system those units historically live inside, the Schneider Electric lineage that runs a large share of Abu Dhabi's transmission and distribution stations, with EcoFIT as the retrofit path that modernises those systems while the station stays energised.
This layer of a substation has a property that shapes all work on it: it cannot simply be switched off and replaced. A grid station keeps feeding its load while its control system is renewed, which turns an equipment swap into a discipline of sectioning, temporary measures, testing and staged cutover, bay by bay.
Almafor has delivered exactly this in Abu Dhabi: substation control and monitoring system replacement on live 400 kV to 11 kV stations for TRANSCO and AADC, including ninety C264 bay control units supplied, installed and tested at the Mussafah 220/33/11 kV grid station MOSG, with redundant gateways to the load dispatch centre, the emergency control centre and the distribution management system.
The work
Supplying, installing, configuring and testing C264 units bay by bay on stations in service. Ninety at one station is our documented record, one unit per bay, so no single controller failure can blind the whole station.
Modernising the legacy PACiS estate through the EcoFIT retrofit path: new station-level hardware and gateways on the existing switchgear, keeping the asset owner's investment in the primary plant.
Redundant gateways from the station to the load dispatch centre, emergency control centre and DMS, with the point mapping, testing and sign-off the network operator's procedures demand.
The protection layer and the control layer meet at the bay. We integrate MiCOM protection relays with the bay control units and the station bus, including the IEC 61850 engineering between them.
GPS station clocks, synchronised timestamps at the bay, and sequence-of-events records that hold up in a fault investigation, the discipline our field notes cover on other platforms too.
The fibre backbone, LAN switches and communications cabinets the bay layer depends on, delivered and terminated by the same team, on the same programme.
Before you tender
Track record
Live-station SCMS replacement for TRANSCO and AADC, documented with the rest of the project record.
TAQA Transmission
TAQA Distribution
TAQA - Transmission
Common questions
It is the controller for one switchgear bay: it reads every switch position in the bay, measures currents and voltages, enforces the interlocking that decides whether an operation is allowed, executes commands from the station level or the control centre, and timestamps everything it sees at the bay itself. One unit per bay means a single failure affects one bay's visibility, never the whole station's.
Yes, and on transmission stations it is usually the only acceptable way. The work is staged bay by bay with sectioning and temporary measures, each bay is tested and returned to service before the next is touched, and the control centres keep visibility of the station throughout. Our ninety-unit replacement at a 220/33/11 kV TRANSCO station was delivered exactly this way.
PACiS is the Schneider Electric substation automation system, with Alstom and AREVA heritage, that runs a large share of the existing stations in the region. EcoFIT is the retrofit path for that estate: renewing the station-level system and gateways while the switchgear and much of the field wiring stay, which is how an asset owner modernises without rebuilding the station.
Yes. The station bus engineering between bay control units, protection relays and the station level is part of the delivery, to the network operator's specification, and it is tested rather than assumed: conformance on paper and behaviour on the bus are checked separately.
Substation control and monitoring replacement for TRANSCO on live grid stations from 400 kV down, and for AADC on the distribution side, including the ninety-bay MOSG station in Mussafah and the Al Khazna grid station. The project pages carry the scope of each.