Definition

What a SCADA supplier actually supplies

In UAE procurement the words SCADA supplier cover everything from a software reseller who ships licences in an envelope to a contractor who delivers a working system. The difference matters, because a SCADA system is not one product. It is servers and operator screens, the software that runs on them, the control and RTU panels below them, the instruments feeding those panels, and the network tying all of it together. Someone has to supply every one of those items, and someone has to make them behave as one system.

This is why the bill of quantities on most UAE projects does not say supply at all. It says supply, installation, testing and commissioning, and it prices them as one line. The client is not buying boxes. They are buying a screen an operator can trust, and the four words exist because a delivery note proves none of that.

Supply and installation is the core of what Almafor does. We price the whole line: the equipment procured against the asset owner's approved vendor list, the control and RTU panels designed and built in our own workshop in Mussafah Industrial Area, and the installation, termination, testing and commissioning done by the same team that built them. We have delivered on that basis in Abu Dhabi since 2008, and we also integrate what we supply with the control centres and systems already in service.

The practical advantage of buying it this way is simple. When one party supplies the equipment and another installs it, every fault found at commissioning starts an argument about whose it is. When the supplier and the installer are the same company, there is no interface to argue over and no warranty gap to fall into.

Buying models

Three ways SCADA is bought in the UAE

Supply only

We deliver the equipment configured and factory tested, and your own team installs it. This works when the buyer has a strong site organisation. The risk sits at the interfaces, which is why we insist on a witnessed factory acceptance test before anything ships, so what leaves the workshop is proven rather than presumed.

Supply and installation

One party owns the job from procurement through delivery, installation and termination. This is where most of our contracts sit, and it is the arrangement we would recommend to anyone building or upgrading a station, because the party who selected the equipment is the party standing in front of it on site.

Supply, installation, testing and commissioning

The full line as utilities and municipalities tender it: everything above, plus point to point testing, commissioning and a signed site acceptance certificate. The contract is finished when the operator trusts the screen, and that is the standard we are usually working to.

Bill of material

What a complete SCADA supply includes

  • SCADA servers, operator workstations and screens, specified for the room they will actually stand in
  • Software licences sized to the real tag count, with the version and support status stated in writing
  • Control and RTU panels, designed and built in our Mussafah workshop and factory tested before delivery
  • PLCs, RTUs and I/O, selected against the approved vendor list and the points schedule
  • Field instruments: level, pressure and flow transmitters, energy and water metering
  • Industrial networking: fibre optic cable and splicing, switches, radio and cellular links for remote sites
  • UPS systems and panel power supplies, rated for UAE ambient temperatures
  • Motor control centres and switchgear, procured and integrated where the station scope includes them
  • Cables, glands and termination materials, so delivery does not stall on consumables
  • As built documentation, operation and maintenance manuals, and recommended spares

Track record

Systems supplied, installed and commissioned in the UAE

On each of these contracts the equipment, the panels and the commissioning came from one company. Follow any card for the scope and the client.

See all delivered projects →

Platforms

What we supply and build on

The platform is chosen by what your control centre already speaks and what your asset owner has approved, not by what we would rather sell. Most of our recent supply has been Schneider Electric hardware with PcVue or Schneider SCADA above it, and we deliver on GE Vernova and Hitachi Energy systems as well.

  • Schneider Electric
  • Modicon M340 and M580
  • Altivar drives
  • PcVue
  • GE Vernova Proficy iFIX
  • GE Vernova Proficy CIMPLICITY
  • Hitachi Energy MicroSCADA
  • IEC 61850
  • IEC 60870
  • Modbus
  • DNP3

Method

From purchase order to signed acceptance

  1. Bill of material against the points schedule

    The BOM is derived from the signal list and the single line diagram, not copied from a previous job. Every item on it can be traced to a point the operator will see or a load the station will run.

  2. Procurement against the approved vendor list

    Long lead items, servers, switchgear and communications equipment, are ordered first and tracked weekly. On brownfield work the delivery programme is built around the outages the operator will actually release, because equipment waiting in a store earns nobody anything.

  3. Panel build and configuration

    Control and RTU panels are built and wired in our Mussafah workshop while the application and controller logic are configured alongside them, so the hardware and the software meet before site, not on it.

  4. Factory acceptance test

    The panels and the application are tested together against the approved schedule, with your engineers present. On the Bawabat Al Sharq pumping station the MCC, the capacitor bank and the PLC system each had their own witnessed test.

  5. Delivery, installation and termination

    The same team that built the panels installs and terminates them. On one potable water pipeline that included supplying and laying seventeen kilometres of fibre optic cable before the SCADA had anything to run on.

  6. Testing, commissioning and handover

    Point to point checks from the field device to the screen, commissioning against the operating philosophy, site acceptance testing, then training, as built drawings and the defect liability period.

Common questions

Questions we are asked about this

What does a SCADA supplier supply?

A complete SCADA supply covers the servers and operator workstations, the software licences, the control and RTU panels, the PLCs and I/O inside them, the field instruments, the communications network and the power supplies that keep it all running. In UAE tenders the scope is usually written as supply, installation, testing and commissioning, which means the supplier is also responsible for installing the equipment and proving it works. A supplier quoting hardware alone is answering a different question.

Do you install what you supply?

Yes, and that is the point of how we work. The engineers who specify and procure the equipment build the panels in our Mussafah workshop, then install, terminate and commission them on site. Supply and installation as one contract is the core of our business, with integration into existing control centres alongside it. One party owns the result, so a fault found at commissioning gets fixed instead of disputed.

Can we buy equipment from you without installation?

Yes. We supply panels and configured systems for other contractors and in house teams to install, and we have no objection to that arrangement. We ask for a witnessed factory acceptance test before dispatch, because once equipment leaves the workshop the installation quality is outside our control, and the test record is what protects both sides.

Which SCADA brands do you supply?

Most of our recent supply is Schneider Electric hardware, Modicon controllers and Altivar drives among it, with PcVue or Schneider SCADA above it. We are recognised by Schneider Electric and we also deliver on GE Vernova Proficy and Hitachi Energy MicroSCADA platforms. The honest answer on any specific project is that the brand is set by your asset owner's approved vendor list and what your control centre already runs, and we quote within that.

Do you supply spares and licences after handover?

Yes. The handover package includes a recommended spares list priced per item, and we supply software licence renewals and expansion licences for the systems we deliver. Our advice is to hold the spares that stop the plant, controller CPUs, power supplies and communication modules, and to buy the rest on lead time rather than tying up money in a store.

How long does delivery of a SCADA system take?

Panels we build ourselves are governed by our workshop programme and typically run some weeks from approved drawings to factory test. The long lead items are what set the schedule: servers, switchgear and some communications equipment can run to several months in the current market. This is why we order long lead equipment first and build the delivery programme around the outages the operator can actually release.

What does a complete SCADA system cost?

It depends on the station count, the tag count, the panel scope and the approvals required, which is why we quote against a points schedule and a single line diagram rather than publish a price list. Our guide to automation project costs explains what drives the number honestly, and a one line enquiry with the drawings attached gets a faster answer than most people expect.

We're here to help!

We want to hear from you. Let us know how we can help.

Send a message

Address
Office 4, Mezzanine 2, Dongfeng car showroom building, Khalifa Bin Zayed The First St
Abu Dhabi, United Arab Emirates

Shortlisting companies?

Ask us anything on WhatsApp, or call and talk it through with an engineer. We reply within one working day.

WhatsApp an engineer See our projects

Call an engineer · +971 55 954 5801