SCADA system for Energy Management System & Energy Network Monitoring System and Automated Metering System
ABU DHABI INVESMENT COUNCIL
Services
A control system is not finished at handover. It is finished at the end of its life, and the years in between are where a maintenance contract earns its keep.
What we do
Every SCADA, energy management and building management system we hand over is working on the day the acceptance certificate is signed. Whether it is still working honestly five years later depends on what happens in between: whether the backups exist, whether the alarms still mean something, whether the instruments still read true, and whether anyone noticed the server disk filling up before it stopped the historian.
That is what a maintenance contract buys. Almafor offers annual maintenance contracts on SCADA systems, energy management, energy metering and monitoring systems, pump station control and the panels, networks and instruments underneath them, across Abu Dhabi, Al Ain and the UAE. The engineers who hold the contract are the same people who design, build and commission these systems for a living, with the workshop in Mussafah behind them.
We maintain systems we delivered, and we take over systems that other companies installed. The second kind starts with a survey and a documentation pass, because the usual condition of an inherited system is no drawings, no backups and a controller password nobody wrote down. Getting that on record is the first visit's work, and it is often the most valuable visit the system ever gets.
The commercial logic is simple on both sides. For the client, a planned cost instead of an emergency one, and faults found on a quiet Tuesday rather than during a heat wave. For us, recurring work keeps our engineers close to your plant, which is exactly where you want them when something real happens.
Typical brief
Most contracts settle into one of three shapes. We quote all three so the comparison is honest.
No scheduled visits. A named number to call, an agreed response time, and agreed rates. The right choice for simple stations with in house operators, and the wrong one for anything whose failure costs more per day than the contract costs per year.
Scheduled visits across the year: inspection, testing, calibration checks, backups taken and verified, alarm and event review, and a written report after each visit. Emergency callout sits on top at contract rates. This is the shape most SCADA and energy management contracts take.
Preventive cover plus agreed spares held against your system and the labour to fit them, so a failed power supply or I/O card is a logbook entry rather than a procurement exercise. Priced against the equipment list, not guessed.
Scope
Track record
Maintenance is credible when the maintainer can show delivered systems of the same kind. These are some of ours.
ABU DHABI INVESMENT COUNCIL
Al Tala Board Manufacturing Company Ltd
Bawabat Al Sharq Development
Ministry of Energy & Infrastructure
Platforms
We maintain what we deliver on and what the installed base in Abu Dhabi actually runs, including systems we did not install.
Method
Every controller, server, drive, instrument and link listed with model, firmware and condition. On systems we did not install this is also where the missing documentation gets rebuilt.
Applications, logic and configurations backed up and proven restorable before anything else is touched. A backup that has never been restored is a hope, not a backup.
Visit frequency, response time, spares list and reporting agreed against what the system actually protects, not copied from a template. A district irrigation network and a tower EMS do not need the same contract.
Visits land on the calendar, reports land after each one, and the recommendations carry prices so the client can decide rather than wonder.
A named number, an engineer who already knows the site, and the record of every previous visit in hand before arriving.
Common questions
A typical annual maintenance contract includes scheduled preventive visits, verified backups of the SCADA application and controller logic, alarm and event review, server and network health checks, instrument verification, panel inspection, and emergency callout at an agreed response time. Comprehensive contracts add spares held against your equipment list and the labour to fit them. The scope is written against your actual system, not a generic checklist.
Yes, and this is a growing share of the enquiries we receive, usually because the original installer has lost interest, closed, or priced support from another country. We start with a survey and a documentation rebuild: asset register, verified backups, passwords recovered and recorded. After the first quarter we know the system well enough to stand behind it.
Yes. Energy management, metering and monitoring are core disciplines for us: we delivered an EMS tracking hundreds of power and water meters across a pair of Abu Dhabi towers, and then held the multi year corrective and preventive maintenance on it after handover, and we delivered energy metering for public buildings. A metering system earns its money only while the meters read true and the reports keep landing, which makes it one of the clearest cases for a maintenance contract we know.
Response time is agreed per contract, because a potable water station and an office energy monitoring system do not carry the same urgency. What makes any promised number real is that our engineers and workshop are in Abu Dhabi, in Mussafah, not in another emirate or another country, and the engineer who responds has the site's history in hand.
You can, and our callout only contract is exactly that with an agreed rate and a known number. The honest arithmetic is that breakdown work costs more per incident, waits in a queue behind contracted clients, and arrives with no backups and no history. Most faults we attend under preventive contracts were visible in the logs weeks earlier. Paying someone to read those logs is usually cheaper than the failure.
Licence renewals, patches and minor version updates can be included in the contract, and we recommend they are, because an unsupported SCADA version is the single most common finding when we survey an inherited system. Major version migrations and hardware replacement are quoted separately when the obsolescence watch flags them, with enough notice to budget rather than react.
It is priced from the asset register: how many controllers, servers, stations and instruments, how critical the process, how far the sites, and what response time you need. A single pump station and a multi site network are different contracts. Send us the equipment list or let us survey it, and the quote comes back itemised so you can see what each level of cover buys.
Related
Send the drawings or BOQ on WhatsApp and an engineer will come back to you. We reply within one working day.
Hello 👋 Tell us about your project, panel or site, and an engineer will reply on WhatsApp.